3.06.0
- The last BTB in a wrapped bus bar can be closed. (Parameter 8991 on BTB) When all BTBs are closed a BTB will be tripped if the open button is pressed on a BTB
- Two shore connections can be in parallel (Parameter 8981 on SC)
- Short time parallel DG and SC. (parameter 2761, 2762, 2763 on DG and SC). Using this function requires breaker feedback from SC wired to inputs on DG and breaker feedback from DG wired to the SC inputs
- When secured mode is activated or Heavy consumer’s needs power the short load dependent start timer is used for starting additional DG’s
- When changing from SC/SG supply to DG supply, DG’s needed for secured mode are started immediately
- Auto and Semi Auto buttons can be deactivated via m-logic (“Deactivate AUTO/SEMI and AUTO button” on DG and EDG)
- M-logic for activating AOP2 buzzer
- Info text on display when wrong password is used
- Start enable input not needed after cranking. If DG is not started after cranking the enable input is needed before next start attempt
- If cranking has been activated the stop coil will always be activated before leaving the start sequence.
- Support for identifiers in USW
- Support for M-logic evaluation in USW
- System Emulation implemented
- D1 option is updated. When DG is parallel with SC the DG performs fixed PF regulation using parameters 2981 and 2982 When parallel with SG the plant PF is used as regulation set point.
- Priority can be changed via m-logic
- If a DG gets running feedback in SWBD-control the run coil will be activated
- Data availability for N option is improved
- The PMS can cancel ramp down for a DG in AUTO and use the DG in the load depending start
- The alarm "Application software version hazard" has been implemented
- Fail class can be selected for External trip alarms
- Minimum number of DG running can be selected for PTH mode
- Parameter for delay of Heavy Consumer acknowledge is implemented
- P and Q measuring has been improved for single and split phase
3.06.0 |
05.12.2011 |
|
3.08.8 |
16.06.2016 |
Corrections:
|
3.08.7 |
09.12.2015 |
Corrections:
|
3.08.6 |
30.10.2015 |
Corrections:
|
3.08.5 |
13.07.2015 |
Corrections:
|
3.08.4 |
16.06.2015 |
Corrections:
|
3.08.3 |
30.03.2015 |
Change:
|
3.08.2 |
24.06.2014 |
Corrections:
|
3.08.1 |
17.09.2013 |
Corrections:
|
3.08.0 |
19.08.2013 |
New feaures:
Changes:
Changed: VDO to RMI.
|
3.07.7 |
28.05.2013 |
|
3.07.6 |
25.04.2013 |
|
3.07.5 |
21.03.2013 |
|
3.07.4 |
30.01.2013 |
|
3.07.3 |
03.12.2012 |
|
3.07.2 |
26.09.2012 |
|
3.07.1 |
21.06.2012 |
|
3.07.0 |
08.06.2012 |
|
3.06.5 |
25.04.2012 |
|
3.06.4 |
03.04.2012 |
|
3.06.3 |
01.03.2012 |
|
3.06.2 |
20.02.2012 |
|
3.06.1 |
07.02.2012 |
|
3.05.5 |
05.12.2011 |
|
3.06.0 |
05.12.2011 |
|
3.05.6 |
05.12.2011 |
|
3.05.4 |
15.08.2011 |
|
3.05.3 |
26.05.2011 |
|
3.05.2 |
09.05.2011 |
|
3.05.1 |
27.04.2011 |
|
3.05.0 |
31.03.2011 |
|
3.04.3 |
21.01.2011 |
|
3.04.2 |
17.11.2010 |
|
3.04.1 |
15.10.2010 |
|
3.04.0 |
13.09.2010 |
|
3.03.4 |
07.05.2010 |
|
3.03.3 |
23.04.2010 |
|
3.03.2 |
16.04.2010 |
|
3.03.1 |
11.01.2010 |
|
3.03.0 |
09.12.2009 |
|
3.02.1 |
02.10.2009 |
|
3.02.0 |
16.07.2009 |
Changes:
|
3.01.0 |
09.03.2009 |
|